Regulation is not a final formality: it is a design constraint.
We integrate the Bolivian legal framework from the first stage of the project. A design that cannot be permitted is not a finished design.
Regulation we apply systematically
Every project is cross-checked against the applicable framework in force. These are the instruments that structure our day-to-day work.
- Law 1333
Environment Law
General framework for environmental management and the regulatory instruments applicable to industrial, mining and infrastructure projects.
- RMCH
Water Pollution Regulation
Effluent and discharge quality criteria that condition the design of every industrial wastewater treatment train.
- EEIA
Environmental impact assessment
Characterisation of the area of influence, impact identification and definition of documented mitigation measures.
- PAA
Environmental adaptation programme
Planning for the progressive adaptation of existing facilities to applicable regulation, with verifiable milestones.
- SECTOR
Mining and industrial regulation
Activity-specific requirements: waste handling, industrial safety, water and land use.
- MUNICIPAL
Municipal regulation
Land use, cadastre, property procedures and local requirements that condition a project’s viability.
How compliance is demonstrated
Compliance is not declared: it is documented. Our method leaves a verifiable trail at every stage.
- 01
Documentary traceability
Every assumption, cited standard and result is backed by calculation records, drawings or the project file. A third party can audit the reasoning.
- 02
Declaration of uncertainty
We make assumptions and scope limits explicit. An honest deliverable states what was not assessed, and why.
- 03
Technical independence
The recommendation rests on the analysis, not on the equipment supplier’s convenience or the client’s urgency.
- 04
Support through permitting
We accompany filing and responses to comments before the competent authority, through to obtaining the instrument.
Quality and safety principles
We do not publish certifications we do not hold. We publish the principles we work by, which can be verified in every deliverable.
- 01Internal technical review before delivery of any document.
- 02Equipment specifications based on process criteria, not supplier catalogues.
- 03Verification of regulatory validity at the time of delivery.
- 04Risk management: hazard identification and control measures in industrial facilities.
- 05Client technical confidentiality as a contractual condition.
Do you need a regulatory reading of your project?
We review the scope, identify the applicable obligations and tell you the realistic permitting route.